2015年12月2日星期三

hydraulic manifold block

A. Switch sequence:
Since testing machine in Jinan Branch controlled microcomputer control software, should ensure that the hydraulic manifold block testing machine is turned on, the software is not closed.
1 Power on: Open the computer (PC) is turned to open the control software tester power.
(2) Off: Turn off test machine control software shut power off computer (PC) power supply.
Two. Software environment:
Must be installed Office2000 (Word2000, Access2000).
III. Showing the value is not displayed:
Please prosecutors testing hydraulic couplers machine and the host computer cable is plugged in, you should ensure that no virtual connection.
Four Note:
1 testing machine key parts (eg: jaw, gearbox, etc.) should always raise grease.
2 computer should be stored in a dry and ventilated room.
3 If you do not use long, once a month should be powered operation.
V. Maintenance:
Provided by the Bureau of Jinan, the main driving force of hydraulic testing machine is a hydraulic machine, so the test machine or plant to use the most general if the proper use and maintenance, and maintenance is to prevent equipment problems important programs,
1 Overhaul steps: first hydraulic ferrule hydraulic oil replaced, then all the various meridians open airway, the blower air pressure on the trachea into the blower, the hydraulic test machine cavity clean, so that inside oil and dirt to clean up.

没有评论:

发表评论